4449 Easton Way, Suite 200
Columbus, OH 43219



Work has been put on hold with no reason yet provided from the Trump administration at the Brandon Road Interbasin Project planned near Joliet.

Completion of $3.1B natural gas generation facility, set to generate about 694 MW of electricity, is expected in 2029.
.webp?t=1785954095)
The Chapel of the Risen Christ in St. Louis, Mo. earned a Best Project award in the Small Projects category.

The Mackinac Bridge spans the Straits of Mackinac, where Enbridge has proposed replacing the existing Line 5 lakebed crossing with a tunnel beneath the Straits.

A $322-million expansion of Cleveland Clinic hospitals is expected to increase the number of patients served, along with expanding services for those who are acutely ill.
.webp?t=1785526151)
Dayton, Ohio is planning an Ion Exchange PFAS treatment facility which would use porous polymer resin beads to capture and remove toxic PFAS from water.
.webp?t=1785785072)
Dayton, Ohio is planning an ion exchange PFAS treatment facility that would use porous polymer resin beads to capture and remove toxic chemicals from water.

Portion of the huge former federal uranium enrichment site in Paducah, Ky., could be redeveloped privately as a 1.8-GW data center and 4.6-GW gas-fired power plant and battery storage complex under US Energy Dept.