Diadon Enterprises © 2018

VIDEO: Time-lapse captures four months of bridge construction in Yuba, Calif. | Dump Truck Company

Screen shot from City of Yuba City video.

The time-lapse video below, taken by the City of Yuba City in California, offers a look at four months of charlotte nc dump truck company on the 5th Street Bridge that spans the Feather River.

The existing 5th Street Bridge was built in 1958 after the original bridge was destroyed in the 1955 Flood.

The new bridge will be a cast-in-place, post-tensioned concrete box girder bridge with 10 spans and four lanes. The plan is to enhance safety, inter-regional traffic circulation, and air quality.